04 / OUR AREAS OF EXPERTISE

Turnkey custom block.

A fully assembled, pressure-tested system, ready to run.

WHAT WE DO

Not a part, but a finished solution.

We run design, manufacturing, valve assembly and testing entirely with one team. You talk to a single contact and know where the project stands at every stage.

We check that the block and the assembly are sound with a pressure test of up to 350 bar, depending on the project. We assess the test results and prepare the block for delivery.

Once the final checks are done, we prepare the block for shipment together with its test report. As during design and manufacturing, you stay in contact with the same team at delivery.

FINAL CHECK BEFORE DELIVERY

Pressure test
up to 350 bar.

We check that the block and the assembly are sound with a pressure test of up to 350 bar, depending on the project. We assess the test results and prepare the block for delivery.

  1. 1
    Sealing

    Port connections and cartridge valve o-rings are checked under pressure.

  2. 2
    Function

    The opening, closing and setting values of the valves are verified against the circuit.

  3. 3
    Record

    The test result is added to the delivery file.

PROCESS

A working system
in five steps.

The full production process on the home page is applied in this service.

01

Design & analysisWe assess your hydraulic schematic and operating conditions, then design the port layout, flow passages and valve cavities.

02

Precision machiningIn line with the approved model we carry out NC drilling, machining and grinding.

03

Valves & assemblyWe select the cartridge valves and assembly components suited to your circuit and complete the assembly.

04

Pressure testWe check that the block and the assembly are sound with a pressure test of up to 350 bar, depending on the project.

05

DeliveryWe prepare the block, with its final checks complete, and the test report for shipment.

TECHNICAL SCOPE

We work
with numbers.

The limits and outputs this service rests on.

ScopeValueNote
ScopeDesign + manufacturing + assembly + testOne team, one contact
Test pressureUp to 350 barSet per project
Machining tolerance±0.02 mmVerified by measurement
Delivery outputAssembled block + test reportReady to run
Quantity rangeFrom a single piece to series productionNo minimum order
Lead time4–6 weeks on averageVaries with complexity, quantity and valve supply
Technical responseSame dayAfter the drawing is shared

FROM OUR WORK

Frames from
the workshop.

Fully assembled blocks, ready for delivery.

FREQUENTLY ASKED

About turnkey
delivery.

If your question is not here,
contact us directly.

+90 312 514 55 52 ↗
How are the quotation and the lead time determined?

We give a technical response to your drawing the same day. Production time is set at the quotation stage according to the complexity of the block, the quantity and valve stock availability.

Is a test report provided?

Yes. For blocks that undergo a pressure test, the test result is included in the delivery file.

I only have a hydraulic schematic. Can we work together?

Yes. We design the port layout and the cavities from the schematic and submit the 3D model for your approval. Once the technical drawing is ready, we move on to manufacturing.

Can we make a prototype and then move to series production?

Yes. We use the same engineering approach for a single custom block as well; the approved design is used unchanged in series production.

RELATED SERVICES

The process does not
end here.

You can also have the individual stages of the process done separately.

Is your drawing ready?
Let’s start together.

Share your hydraulic schematic or technical drawing. Our engineering team will give you a technical response the same day.